
New Build Screeding · Somerset
New Build Screeding — Dunster, Somerset
Developers building across Dunster need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Get a fixed price for New Build Screeding — Dunster, Somerset
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Dunster need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Dunster plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Dunster jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dunster sits Taunton (22 mi), and we work the surrounding villages on the same week's diary.
Why Dunster site context matters
County
Somerset
District
Somerset West
Postcode
TA24
Nearest city
Taunton (22 mi)
Nearest motorway
M5 (J25, ~25 mi)
Primary A-road
A39
Local industries
National Trust, tourism
Common builds
medieval high-street, castle-estate cottages
Dunster projects we see most
- Medieval high-street — a regular brief in Dunster
- Castle-estate cottages — a regular brief in Dunster
- Small hotels — a regular brief in Dunster
- National Trust — a regular brief in Dunster
- Tourism — a regular brief in Dunster
New Build Screeding in Dunster — how it works
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Dunster development moves through screed without a gap in the build sequence.
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Dunster site rather than a new quote for every unit.
Cemfloor systems for Dunster
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Latest jobs across Somerset



Nearby villages and towns
What backs our Dunster work
Dunster screed questions, answered
How quickly can follow-on trades get back onto a plot?+
Liquid screed allows light foot traffic from 24-48 hours per plot, which is why most Dunster developers specify it over traditional screed on programme-driven builds.
Do you provide RAMS for a new build site in Dunster?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Dunster development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you price the whole Dunster site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Dunster programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Whether it's a handful of units or a full rural self-builders and farms phase in Dunster, the aim is consistent, plot after plot flat, dried on schedule, handed over with its own written record.
Book your Dunster development into the diary
Multi-plot schemes need booking well ahead. Reserve your Dunster pour dates now and we'll confirm logistics with your site manager.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
