
Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed in Dunsford
For Dunsford jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
Get a fixed price for Traditional Sand & Cement Screed in Dunsford
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
For Dunsford jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
For Dunsford wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Most of our Dunsford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dunsford sits Exeter (7 mi), and we work the surrounding villages on the same week's diary.
EX6 access, routes and logistics
County
Devon
District
Teignbridge
Postcode
EX6
Nearest city
Exeter (7 mi)
Nearest motorway
M5 (J31, ~10 mi)
Primary A-road
B3212
Local industries
upland farming, holiday lets
Common builds
granite cottages, farmhouse conversions
What Dunsford builds usually need
- Granite cottages — a regular brief in Dunsford
- Farmhouse conversions — a regular brief in Dunsford
- Moor-edge new-builds — a regular brief in Dunsford
- Annex extensions — a regular brief in Dunsford
- Upland farming — a regular brief in Dunsford
Traditional Sand & Cement Screed in Dunsford — how it works
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
For Dunsford wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Cemfloor systems for Dunsford
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Dunsford-area projects



Dunsford-area service radius
Why Dunsford clients pick us
Hundreds of square metres poured around Dunsford in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
What people in Dunsford usually ask
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How is sand and cement screed different from liquid screed in Dunsford?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Dunsford job.
How long does a sand and cement screed take to dry in Dunsford?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Dunsford?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
If your Dunsford job needs a fall to a drain, an external step or a floor that shrugs off standing water, Traditional Sand & Cement Screed is very often the right call, not the fallback option.
EX6 coverage for traditional screed
From Dunsford out to the surrounding villages, we carry both liquid and sand and cement screed crews, so you get the right one for the job.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
