Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed Poured to SR1 in Moretonhampstead
Moretonhampstead builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Get a fixed price for Traditional Sand & Cement Screed Poured to SR1 in Moretonhampstead
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Moretonhampstead builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Most of our Moretonhampstead jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Moretonhampstead sits Exeter (15 mi), and we work the surrounding villages on the same week's diary.
Traditional Sand & Cement Screed in Moretonhampstead — how it works
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
What we plan around in Moretonhampstead
County
Devon
District
Teignbridge
Postcode
TQ13
Nearest city
Exeter (15 mi)
Nearest motorway
M5 (J31, ~17 mi)
Primary A-road
A382 / B3212
Local industries
Dartmoor tourism, agriculture
Common builds
Dartmoor granite cottages, small new estates
Where liquid screed earns its keep in Moretonhampstead
- Dartmoor granite cottages — a regular brief in Moretonhampstead
- Small new estates — a regular brief in Moretonhampstead
- Rural workshops — a regular brief in Moretonhampstead
- Dartmoor tourism — a regular brief in Moretonhampstead
- Agriculture — a regular brief in Moretonhampstead
Latest jobs across Devon



Step-by-step for a Moretonhampstead job
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
What backs our Moretonhampstead work
Adjacent areas — usually same-week diary
Cemfloor systems for Moretonhampstead
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Moretonhampstead screed questions, answered
Is sand and cement screed suitable for a wet room in Moretonhampstead?+
Yes, it is the standard choice for wet rooms, shower rooms and balconies because it tolerates sustained water contact in a way gypsum-based liquid screeds do not.
How is sand and cement screed different from liquid screed in Moretonhampstead?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Moretonhampstead job.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How long does a sand and cement screed take to dry in Moretonhampstead?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Moretonhampstead?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Fixed-price sand and cement screed near Moretonhampstead
One quote covers prep, mix, lay and finish. No day-rate surprises on your Moretonhampstead job.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
