Liquid screed pour near Underfloor Heating Screed in Dunsford

Underfloor Heating Screed · Devon

Underfloor Heating Screed in Dunsford

Across Dunsford we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed in Dunsford

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Dunsford we work hand-in-hand with UFH installers — they lay and pressure-test the pipes, we pour around them the next day at the right depth and thermal performance.

Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Dunsford renovations.

Most of our Dunsford jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Dunsford sits Exeter (7 mi), and we work the surrounding villages on the same week's diary.

Why Dunsford site context matters

County

Devon

District

Teignbridge

Postcode

EX6

Nearest city

Exeter (7 mi)

Nearest motorway

M5 (J31, ~10 mi)

Primary A-road

B3212

Local industries

upland farming, holiday lets

Common builds

granite cottages, farmhouse conversions

Dunsford projects we see most

  • Granite cottages — a regular brief in Dunsford
  • Farmhouse conversions — a regular brief in Dunsford
  • Moor-edge new-builds — a regular brief in Dunsford
  • Annex extensions — a regular brief in Dunsford
  • Upland farming — a regular brief in Dunsford

Underfloor Heating Screed in Dunsford — how it works

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

The screed self-levels around every loop, eliminating the voids you get under hand-laid traditional screed. That means the floor responds faster when the heating calls for it, and stores less wasted heat.

Cemfloor systems for Dunsford

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Latest jobs across Devon

UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

What backs our Dunsford work

Hundreds of square metres poured around Dunsford in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Dunsford screed questions, answered

How does this affect my floor coverings in Dunsford?+

Once commissioned and the floor moisture content is signed off (CM test, typically below 0.5% for tile), most coverings go down as normal. We hand you a commissioning record.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

When can I switch the underfloor heating on in Dunsford?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Dunsford clients to the schedule.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

From the first site visit to the final laitance sand, our Dunsford jobs are run as one fixed-price piece of work — no creeping extras.

Coverage across EX6

From Dunsford to the surrounding villages, we keep the radius tight so logistics stay simple.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp