Underfloor Heating Screed · Devon

Underfloor Heating Screed — Combe Martin, Devon

When Combe Martin self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

Cemfloor-certified work near Combe Martin

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Start a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Underfloor Heating Screed — Combe Martin, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

When Combe Martin self-builders specify UFH, the screed is what makes the system efficient. We pump Cemfloor Therm directly around your pressure-tested pipework for full encapsulation.

For Combe Martin UFH builds the typical sequence is: insulation board down, pipes clipped and pressure-tested, edge insulation in place, then we pump and level in a single visit.

Most of our Combe Martin jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Combe Martin sits Barnstaple (15 mi), and we work the surrounding villages on the same week's diary.

Who this is for in Combe Martin

Combe Martin is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

EX34 access, routes and logistics

County

Devon

District

North Devon

Postcode

EX34

Nearest city

Barnstaple (15 mi)

Nearest motorway

M5 (J27, ~52 mi)

Primary A-road

A399

Local industries

tourism lets, harbour trades

Common builds

seafront apartments, 1930s coastal semis

Underfloor Heating Screed in Combe Martin — how it works

Liquid UFH screed lets you run a thinner build-up than traditional bays — useful when ceiling heights or threshold levels are tight in Combe Martin renovations.

We pour Cemfloor Therm liquid screed over your UFH pipes at 50mm above pipe (typically 65-75mm total over insulation), giving full pipe encapsulation, fast thermal response and a finished surface flat to SR1.

What to expect on pour day in Combe Martin

  1. 1

    UFH installer fits manifold, pipes and pressure-tests to 6 bar

  2. 2

    We confirm edge insulation, DPM and pipe coverage depth

  3. 3

    Pump and level the screed with pipes still under pressure

  4. 4

    Slow commissioning of the heating — usually after 7 days, ramping per manufacturer spec

  5. 5

    Floor coverings once moisture is signed off and commissioning is complete

Floors poured around Combe Martin

UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton

Materials and systems we use in Combe Martin

Cemfloor Therm

Liquid screed engineered for UFH — lambda 2.1 W/mK, fast response.

PIR/Phenolic insulation board

70-150mm typical depending on build regs U-value target.

Edge insulation strip

Critical around UFH zones to allow thermal expansion.

Pressure-testing kit

Pipes held at 6 bar through the pour to flag any damage immediately.

Common Combe Martin build questions

When can I switch the underfloor heating on in Combe Martin?+

On Cemfloor Therm we typically start a slow commissioning cycle from day 7, ramping 5°C per day per manufacturer spec. Forcing it earlier risks cracking, so we hold Combe Martin clients to the schedule.

What if a pipe leaks during the pour?+

Pipes are held at 6 bar through the pour. Any pressure drop is flagged immediately and we stop, fix and continue — this is exactly why we keep the manifold under test.

Will the screed crack as the UFH heats up?+

Properly isolated at the edges and at doorway joints, no. We pour with the pipes pressure-tested and follow a controlled commissioning schedule.

What depth of screed over UFH pipes do you recommend?+

Minimum 50mm cover above the highest pipe — usually a 65-75mm total slab over insulation. Thicker if you want more thermal mass.

Does liquid UFH screed improve EPC ratings?+

Indirectly — yes. Faster response and lower running temperatures help heat-pump COP, which feeds into your SAP/EPC. We'll share the manufacturer data your assessor needs.

Why use liquid screed over UFH rather than sand-and-cement?+

Liquid screed flows around the pipes with no voids, giving 20-30% better thermal response and lower running costs than a hand-laid screed. That's why most Combe Martin UFH installers recommend it.

Proof from the Devon workload

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Combe Martin-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor-certified work near Combe Martin

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp