Traditional Sand & Cement Screed · Devon

Traditional Sand & Cement Screed — Combe Martin, Devon

Combe Martin builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Fixed-price sand and cement screed near Combe Martin

One quote covers prep, mix, lay and finish. No day-rate surprises on your Combe Martin job.

Start a quote07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Traditional Sand & Cement Screed — Combe Martin, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Combe Martin builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

Most of our Combe Martin jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Combe Martin sits Barnstaple (15 mi), and we work the surrounding villages on the same week's diary.

Who this is for in Combe Martin

Combe Martin is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

EX34 access, routes and logistics

County

Devon

District

North Devon

Postcode

EX34

Nearest city

Barnstaple (15 mi)

Nearest motorway

M5 (J27, ~52 mi)

Primary A-road

A399

Local industries

tourism lets, harbour trades

Common builds

seafront apartments, 1930s coastal semis

Traditional Sand & Cement Screed in Combe Martin — how it works

For Combe Martin wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.

We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.

What to expect on pour day in Combe Martin

  1. 1

    Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach

  2. 2

    Substrate prep, priming or DPM, and setting out of bay lines and laser levels

  3. 3

    Mix and place the screed in bays, compacting as we go to remove voids

  4. 4

    Hand float or power trowel to a flat, dense SR2 finish

  5. 5

    Protect and allow to cure, typically a day per millimetre of depth after the first 50mm

  6. 6

    Follow-up inspection before floor coverings or tiling begin

Floors poured around Combe Martin

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot

Materials and systems we use in Combe Martin

Sand and cement (typically 4:1 or 5:1 mix)

Semi-dry, hand-compacted mix ratio adjusted to depth and loading.

SBR bonding agent

Slurry-brushed onto the substrate for bonded screeds under 40mm.

Polypropylene fibre reinforcement

Added to reduce shrinkage cracking on larger bays.

DPM and separating membrane

For unbonded or floating screeds over insulation.

Falls formed to drain outlets

Built into the screed thickness for wet rooms and balconies.

Edge and movement joints

Set at bay lines, doorways and around columns.

Common Combe Martin build questions

Is sand and cement cheaper than liquid screed?+

Materials cost less per square metre, but labour is higher because it is hand-placed rather than pumped. On smaller or awkward-access Combe Martin jobs the total cost is often similar.

Will the screed crack?+

Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Combe Martin job.

What SR rating do you achieve on a trowelled screed?+

We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.

How is sand and cement screed different from liquid screed in Combe Martin?+

Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.

Do you use a screed pump for sand and cement in Combe Martin?+

On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.

Can you match an existing sand and cement floor level?+

Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.

Proof from the Devon workload

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Combe Martin-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Fixed-price sand and cement screed near Combe Martin

One quote covers prep, mix, lay and finish. No day-rate surprises on your Combe Martin job.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp