New Build Screeding · Devon
New Build Screeding — Combe Martin, Devon
Developers building across Combe Martin need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Cemfloor-certified plot screeding near Combe Martin
Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.
Get a written quote07791 510849 WhatsApp usGet a fixed price for New Build Screeding — Combe Martin, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Combe Martin need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Combe Martin plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Combe Martin jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Combe Martin sits Barnstaple (15 mi), and we work the surrounding villages on the same week's diary.
Built for Combe Martin coastal residential and hospitality clients
Combe Martin is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
EX34 access, routes and logistics
County
Devon
District
North Devon
Postcode
EX34
Nearest city
Barnstaple (15 mi)
Nearest motorway
M5 (J27, ~52 mi)
Primary A-road
A399
Local industries
tourism lets, harbour trades
Common builds
seafront apartments, 1930s coastal semis
New Build Screeding in Combe Martin — how it works
Each plot is pumped, levelled and spike-rolled as its own visit, but priced and scheduled as part of one development-wide package, so you get a single point of contact across the whole Combe Martin site rather than a new quote for every unit.
Output on a typical Combe Martin plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Step-by-step for a Combe Martin job
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Recent work near Combe Martin



Cemfloor systems for Combe Martin
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
Combe Martin-area service radius
FAQs from Combe Martin clients
How many plots can you screed per day on a Combe Martin development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
Do you provide RAMS for a new build site in Combe Martin?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Combe Martin site come out to the same depth and finish.
Do you price the whole Combe Martin site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you scale up if the Combe Martin programme accelerates?+
Yes, we can bring on additional pump capacity and crew for phases that need to move faster, provided we have reasonable notice to schedule it.
Trust points for a Combe Martin brief
Cemfloor-certified plot screeding near Combe Martin
Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
