Devon Coverage

Christow Liquid Screed Specialists

Across Christow and the EX6 postcode area, we lay laser-flat liquid screed for homeowners, self-builders and main contractors.

Across Christow and the EX6 postcode area, we lay laser-flat liquid screed for homeowners, self-builders and main contractors.

We're Christow is a moor-edge parish where access, insulation and thermal mass shape every pour. Our coverage runs across EX6, taking in Bridford-side and out toward , with the M5 (J31, ~13 mi) on hand for materials and pump trucks.

Most of our Christow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Christow sits Exeter (10 mi), and we work the surrounding villages on the same week's diary.

Liquid screed in Christow — how it works

On larger Christow jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.

We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.

Why Christow site context matters

County

Devon

District

Teignbridge

Postcode

EX6

Nearest city

Exeter (10 mi)

Nearest motorway

M5 (J31, ~13 mi)

Primary A-road

B3193

Local industries

upland farming, holiday lets

Common builds

granite cottages, farmhouse conversions

Christow projects we see most

  • Granite cottages — a regular brief in Christow
  • Farmhouse conversions — a regular brief in Christow
  • Moor-edge new-builds — a regular brief in Christow
  • Annex extensions — a regular brief in Christow
  • Upland farming — a regular brief in Christow

Floors poured around Christow

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

What to expect on pour day in Christow

  1. 1

    Site visit and written quote

  2. 2

    Prep — insulation, DPM, edge isolation, UFH coordination

  3. 3

    Pump day — single-visit pour, level and spike-roll

  4. 4

    Cover and cure for 24-48 hours

  5. 5

    Moisture-test sign-off, floor coverings

Proof from the Devon workload

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Christow-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Materials and systems we use in Christow

Cemfloor CT-C30-F6

Cement-based liquid screed — robust, low-shrinkage, fast-drying.

Cemfloor Therm

Thermally-optimised for UFH.

PIR insulation + DPM

Build-up tuned to your build regs U-value.

Common Christow build questions

Do you handle UFH coordination?+

Yes — we work with whichever UFH installer is on your Christow project and align dates with their pressure-test schedule.

How long does the floor take to dry in Christow?+

Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Christow pour.

Do you offer a guarantee?+

As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.

Can you give a fixed-price quote?+

Yes — every Christow quote is a written fixed price against a defined scope. No day-rate surprises.

Do you cover Christow?+

Yes — Christow sits inside our regular 30-mile working radius and we have active diary there most months.

Are you fully insured?+

Yes — public liability, employers' liability and CAR cover, with certificates available on request for any Christow site.

Get a Christow liquid screed quote

Send us the floor area and target dates — fixed-price quote back the same day on most Christow jobs.

Call now · 07765 712609