Liquid Screed · Devon

Liquid Screed — Christow, Devon

Across Christow we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Christow, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Christow we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Christow jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Christow sits Exeter (10 mi), and we work the surrounding villages on the same week's diary.

Liquid Screed in Christow — how it works

Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

Why Christow site context matters

County

Devon

District

Teignbridge

Postcode

EX6

Nearest city

Exeter (10 mi)

Nearest motorway

M5 (J31, ~13 mi)

Primary A-road

B3193

Local industries

upland farming, holiday lets

Common builds

granite cottages, farmhouse conversions

Christow projects we see most

  • Granite cottages — a regular brief in Christow
  • Farmhouse conversions — a regular brief in Christow
  • Moor-edge new-builds — a regular brief in Christow
  • Annex extensions — a regular brief in Christow
  • Upland farming — a regular brief in Christow

Floors poured around Christow

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham

Step-by-step for a Christow job

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Proof from the Devon workload

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Christow-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Cemfloor systems for Christow

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Common Christow build questions

Do you sand the floor afterwards?+

On calcium-sulphate screeds we sand off the surface laitance roughly 5-7 days after the pour, before any floor coverings go down.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Christow site visit.

How quickly can I walk on a liquid screed floor in Christow?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Christow job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Christow pour in the colder months.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Do I need to be on site for the pour in Christow?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Christow access route, pump position and waste route before the day.

Book your Christow pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp