Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed — Bratton Clovelly, Devon
Deep make-up floors in Bratton Clovelly, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.

Get a fixed price for Traditional Sand & Cement Screed — Bratton Clovelly, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Deep make-up floors in Bratton Clovelly, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Most of our Bratton Clovelly jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Bratton Clovelly sits Exeter (28 mi), and we work the surrounding villages on the same week's diary.
EX20 access, routes and logistics
County
Devon
District
West Devon
Postcode
EX20
Nearest city
Exeter (28 mi)
Nearest motorway
M5 (J31, ~30 mi)
Primary A-road
A3079
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Traditional Sand & Cement Screed in Bratton Clovelly — how it works
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
For Bratton Clovelly wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Built for Bratton Clovelly rural self-builders and farms
Bratton Clovelly sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Cemfloor systems for Bratton Clovelly
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Bratton Clovelly-area projects



Why Bratton Clovelly clients pick us
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~30 mi) access window and A3079 traffic patterns
What people in Bratton Clovelly usually ask
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Bratton Clovelly job.
How is sand and cement screed different from liquid screed in Bratton Clovelly?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
How long does a sand and cement screed take to dry in Bratton Clovelly?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Bratton Clovelly?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Bratton Clovelly-area service radius
Whether it's a single wet room or a full rural self-builders and farms scheme in Bratton Clovelly, we set out bays, control the falls and hand back a dense, SR2-flat floor ready for tiling.
Book a bay-laid screed in Bratton Clovelly
Hand-trowelled screeds take longer to schedule around drying and access. Get your Bratton Clovelly job in the diary early.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
