New Build Screeding · Devon

Cemfloor-Certified New Build Screeding Across Beer

Beer new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified New Build Screeding Across Beer

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Beer new build schemes live or die on programme. A liquid screed poured to a tight plot sequence gets trades back on site in 24-48 hours rather than the week or more traditional screed demands.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Beer development moves through screed without a gap in the build sequence.

Most of our Beer jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Beer sits Exeter (24 mi), and we work the surrounding villages on the same week's diary.

Beer projects we see most

  • Cliffside cottages — a regular brief in Beer
  • Fishery sheds — a regular brief in Beer
  • Small B&Bs — a regular brief in Beer
  • Fishing — a regular brief in Beer
  • Tourism — a regular brief in Beer

Who this is for in Beer

Beer is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

New Build Screeding in Beer — how it works

New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Beer scheme, so plot 1 and plot 40 come out identical.

We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Beer development moves through screed without a gap in the build sequence.

Materials and systems we use in Beer

Cemfloor CT-C30-F6

Standard cement-based liquid screed for repeat plot pours.

Cemfloor Therm

Where the development spec includes underfloor heating as standard.

Insulation to development U-value spec

PIR or EPS specified once and repeated across every plot.

Edge isolation strip

Fitted to a consistent standard detail across the whole site.

DPM to NHBC/warranty provider standard

Matched to the site's chosen warranty provider requirements.

Plot-by-plot moisture test kit

CM testing to hand over each unit with its own written record.

What to expect on pour day in Beer

  1. 1

    Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates

  2. 2

    Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot

  3. 3

    Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn

  4. 4

    Protect each plot for 24-48 hours while the crew moves on to the next

  5. 5

    Moisture testing and a written handover record issued per plot

  6. 6

    Snagging and any remedial work coordinated directly with the site manager before final trades move in

Floors poured around Beer

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
UFH screed laid over a coastal apartment in Exmouth
UFH screed laid over a coastal apartment in Exmouth
Smooth finish on a garden room pour in Exmouth
Smooth finish on a garden room pour in Exmouth

Proof from the Devon workload

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J25, ~24 mi) access window and B3174 traffic patterns

Common Beer build questions

Are you set up for NHBC or LABC warranty requirements?+

Yes, our build-ups and documentation are prepared to match whichever warranty provider your Beer development is registered with.

How many plots can you screed per day on a Beer development?+

It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.

Do you provide RAMS for a new build site in Beer?+

Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.

How do you hand over moisture readings on a multi-plot job?+

Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.

Can you keep the same build-up across every plot?+

Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Beer site come out to the same depth and finish.

Do you price the whole Beer site or plot by plot?+

Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.

Cemfloor-certified plot screeding near Beer

Manufacturer-backed installs, per-plot moisture records and a ten-year guarantee on qualifying units.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp