Industrial & Distribution · Devon

Cement-Based Warehouse Screed — Okehampton, Devon

Large-area pumped screed for warehouses and distribution sheds.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cement-Based Warehouse Screed — Okehampton, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

For a Okehampton logistics build near A30, the same crew and method scale from small fit-outs to large shell floors. The standard doesn't change with the size.

Distribution and warehouse briefs across Okehampton usually need one thing above all — flatness under racking. We hit SR1 on continuous pours so rack feet bed evenly and MHE runs true.

For Okehampton warehouses on EX20, the standard build-up is 50–75mm bonded or unbonded Cemfloor over the power-float, laid in one continuous placement. We coordinate with the racking installer's setting-out so the finished floor works from day one.

Okehampton briefs we see most in this sector

  • Multi-bay units where each tenant needs a matched flat floor
  • Cold-chain and food-grade slab overlays across Okehampton sites
  • Retro-fit warehouse slabs where the substrate stays in place
  • Distribution sheds and pallet-racking floors around Okehampton
  • Light-manufacturing floors on Okehampton industrial estates

Built for Okehampton distribution and logistics contractors

We work Okehampton distribution and logistics contractors the same way across every job — one point of contact, one written fixed price, one pour date pinned in the diary. Large-area pumped screed for warehouses and distribution sheds. For Okehampton briefs specifically, a Dartmoor-edge A30 town with heavy agricultural-conversion and rural new-build demand.

Warehouse Floor Screed in Okehampton — how it works

The pour itself is straightforward on paper: pump Cemfloor at 220–240 flow, hit the setting-out laser, spike-roll for de-aeration, cover overnight. In Okehampton the delivery logistics are the real work — batching to the A30 traffic pattern, and keeping the static line clear across long runs.

For Okehampton warehouse jobs we mobilise a static mixer on site plus a dedicated pump crew, with a second three-man team on the finish. The typical output is 300–500m² per shift, and we chase back with a moisture-test schedule keyed to the flooring contractor's install date.

Cemfloor systems for this sector in Okehampton

Cemfloor CT-C30-F6

Cement-based liquid screed, rapid-drying, robust for MHE loading.

Static line pump + spike roller

Continuous large-area placement with de-aerated finish.

Edge isolation strip

Handles thermal movement at building perimeters and bay lines.

Polyethylene DPM

Below-screed vapour control on unbonded warehouse build-ups.

Step-by-step for a warehouse screed pour in Okehampton

  1. 1

    Pre-start site visit and access survey

  2. 2

    RAMS, method statement and CDM paperwork issued

  3. 3

    Substrate prep — priming, edge insulation, DPM checks

  4. 4

    Single-visit continuous pump pour with laser levelling

  5. 5

    Cover, cure, moisture-test and flatness sign-off

Floors we've poured for this sector across Devon

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension
Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot

warehouse screed in areas near Okehampton

Proof from the Devon warehouse screed workload

Focused on Devon commercial pours
Single-team continuity — same crew, same standards, every day
Direct relationships with major UK screed manufacturers
Documented flatness handover — no post-pour disputes

warehouse screed FAQs from Okehampton clients

What depth do you pour for warehouse floors?+

Typically 50–75mm bonded or unbonded, depending on substrate and the loading spec agreed with the Okehampton main contractor.

Can you pour into a live-tenant unit?+

Yes — out-of-hours pours on Okehampton multi-let sites are standard; we coordinate access with the FM lead.

How large a warehouse floor can you pour in a day in Okehampton?+

Regular output is 300–500m² per shift on continuous placement. Larger Okehampton sheds get sectioned pours with cold-joint detailing agreed up front.

Can you work to a main-contractor programme in Okehampton?+

Yes — RAMS and CDM paperwork are issued before mobilisation and we hit sequenced dates alongside the racking installer.

How long before racking or MHE can go on?+

Foot traffic 24–48 hours, light loading around 5–7 days, full loading once moisture-tested — usually 3–4 weeks for a typical Okehampton warehouse depth.

Do you handle racking-loaded flatness surveys?+

Yes — SR1 to a 2m edge as standard, full 3m survey on request for Okehampton distribution sheds, with the report lodged in the O&M pack.

Warehouse screed quote for Okehampton

Send us drawings, area and target dates — we'll come back with a fixed price and a firm pour date for your Okehampton shed.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp