Industrial & Distribution · Devon
Bratton Clovelly Distribution-Shed Screed Pours
Large-area pumped screed for warehouses and distribution sheds.
Get a fixed price for Bratton Clovelly Distribution-Shed Screed Pours
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Warehouse and distribution floors in Bratton Clovelly get our full commercial spec: rapid-drying cement-based system, moisture-tested handover, and a written flatness report against a 3m straight-edge.
For a Bratton Clovelly shed on EX20, we pour Cemfloor CT-C30-F6 as a rapid-programme floor: unloaded through a static line pump, laser-levelled, spike-rolled, and covered before the shift ends.
Bratton Clovelly sits within our regular working radius, and we plan yard access around real lorry movements on A3079. On big-shed pours we schedule mixer batches tightly to avoid cold joints across the slab.
Typical warehouse screed projects around Bratton Clovelly
- Distribution sheds and pallet-racking floors around Bratton Clovelly
- Cold-chain and food-grade slab overlays across Bratton Clovelly sites
- Retro-fit warehouse slabs where the substrate stays in place
- Light-manufacturing floors on Bratton Clovelly industrial estates
- Multi-bay units where each tenant needs a matched flat floor
Who this is for around Bratton Clovelly
We work Bratton Clovelly distribution and logistics contractors the same way across every job — one point of contact, one written fixed price, one pour date pinned in the diary. Large-area pumped screed for warehouses and distribution sheds. For Bratton Clovelly briefs specifically, a rural parish where careful access and staged pours matter as much as the mix.
Warehouse Floor Screed in Bratton Clovelly — how it works
For Bratton Clovelly warehouse jobs we mobilise a static mixer on site plus a dedicated pump crew, with a second three-man team on the finish. The typical output is 300–500m² per shift, and we chase back with a moisture-test schedule keyed to the flooring contractor's install date.
Rack-loaded floors need honest flatness. We measure and record it — SR1 against a 2m edge as standard, with a full 3m survey on request. If Bratton Clovelly main contractors need that survey lodged in the O&M pack, we supply it before demobilisation.
Materials and systems for Bratton Clovelly warehouse screed
Cemfloor CT-C30-F6
Cement-based liquid screed, rapid-drying, robust for MHE loading.
Static line pump + spike roller
Continuous large-area placement with de-aerated finish.
Edge isolation strip
Handles thermal movement at building perimeters and bay lines.
Polyethylene DPM
Below-screed vapour control on unbonded warehouse build-ups.
What pour day looks like on a Bratton Clovelly warehouse screed job
- 1
Pre-start site visit and access survey
- 2
RAMS, method statement and CDM paperwork issued
- 3
Substrate prep — priming, edge insulation, DPM checks
- 4
Single-visit continuous pump pour with laser levelling
- 5
Cover, cure, moisture-test and flatness sign-off
Recent warehouse screed work near Bratton Clovelly



Other Bratton Clovelly-area places we cover for this
What backs our Bratton Clovelly warehouse screed work
- 01Cemfloor-certified — manufacturer product warranty plus our workmanship guarantee
- 02Set up for large single-visit pours
- 03Out-of-hours and phased pours on live-tenant sites
- 04Local knowledge of Bratton Clovelly-area access and delivery windows
What people in Bratton Clovelly ask about this
How is the finish measured?+
SR1 to a 2m straight-edge as standard; full survey against the CSTR relevant to the Bratton Clovelly loading spec on request.
Do you handle racking-loaded flatness surveys?+
Yes — SR1 to a 2m edge as standard, full 3m survey on request for Bratton Clovelly distribution sheds, with the report lodged in the O&M pack.
Can you pour into a live-tenant unit?+
Yes — out-of-hours pours on Bratton Clovelly multi-let sites are standard; we coordinate access with the FM lead.
Do you cover Bratton Clovelly for warehouse pours?+
Yes — Bratton Clovelly sits inside our commercial working radius; we quote and pour large-area jobs across the wider Devon area from this base.
Do you supply the DPM and edge insulation?+
Yes if the package includes it, or we work to the main contractor's supplied materials — both are common on Bratton Clovelly logistics jobs.
What depth do you pour for warehouse floors?+
Typically 50–75mm bonded or unbonded, depending on substrate and the loading spec agreed with the Bratton Clovelly main contractor.
Talk to a Bratton Clovelly commercial screed team
Programme fills 3–6 weeks ahead for large-area pours — pin a date and we'll confirm logistics.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
