Traditional Sand & Cement Screed · Dorset
Traditional Sand & Cement Screed in Weymouth
For Weymouth jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.

Get a fixed price for Traditional Sand & Cement Screed in Weymouth
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
For Weymouth jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
For Weymouth wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Most of our Weymouth jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Weymouth sits Dorchester (8 mi), and we work the surrounding villages on the same week's diary.
Why Weymouth site context matters
County
Dorset
District
Dorset
Postcode
DT4
Nearest city
Dorchester (8 mi)
Nearest motorway
M5 (J25, ~50 mi)
Primary A-road
A354
Local industries
tourism lets, harbour trades
Common builds
seafront apartments, 1930s coastal semis
Traditional Sand & Cement Screed in Weymouth — how it works
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Right fit for Weymouth coastal residential and hospitality clients
Weymouth is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
Specifications suited to Weymouth builds
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Recent work near Weymouth



Trust points for a Weymouth brief
Hundreds of square metres poured around Weymouth in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
FAQs from Weymouth clients
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Weymouth job.
How is sand and cement screed different from liquid screed in Weymouth?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
Do you use a screed pump for sand and cement in Weymouth?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
How long does a sand and cement screed take to dry in Weymouth?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Nearby villages and towns
From site visit to final trowel pass, our Weymouth sand and cement jobs are quoted as one fixed price, with drying time explained up front so nobody is caught out.
Need a hand-trowelled screed in Weymouth?
Tell us the depth, falls and access, and we'll come back with a fixed price for your Weymouth sand and cement floor.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
