Traditional Sand & Cement Screed · Dorset

Cemfloor-Certified Traditional Sand & Cement Screed Across Burton Bradstock

Deep make-up floors in Burton Bradstock, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified Traditional Sand & Cement Screed Across Burton Bradstock

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Deep make-up floors in Burton Bradstock, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.

We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.

Most of our Burton Bradstock jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Burton Bradstock sits Bridport (3 mi), and we work the surrounding villages on the same week's diary.

Traditional Sand & Cement Screed in Burton Bradstock — how it works

Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

DT6 access, routes and logistics

County

Dorset

District

Dorset

Postcode

DT6

Nearest city

Bridport (3 mi)

Nearest motorway

M5 (J25, ~45 mi)

Primary A-road

B3157

Local industries

tourism lets, harbour trades

Common builds

seafront apartments, 1930s coastal semis

What Burton Bradstock builds usually need

  • Seafront apartments — a regular brief in Burton Bradstock
  • 1930s coastal semis — a regular brief in Burton Bradstock
  • Harbourside conversions — a regular brief in Burton Bradstock
  • Guest-house retrofits — a regular brief in Burton Bradstock
  • Tourism lets — a regular brief in Burton Bradstock

Recent work near Burton Bradstock

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton

Step-by-step for a Burton Bradstock job

  1. 1

    Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach

  2. 2

    Substrate prep, priming or DPM, and setting out of bay lines and laser levels

  3. 3

    Mix and place the screed in bays, compacting as we go to remove voids

  4. 4

    Hand float or power trowel to a flat, dense SR2 finish

  5. 5

    Protect and allow to cure, typically a day per millimetre of depth after the first 50mm

  6. 6

    Follow-up inspection before floor coverings or tiling begin

Trust points for a Burton Bradstock brief

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J25, ~45 mi) access window and B3157 traffic patterns

Cemfloor systems for Burton Bradstock

Sand and cement (typically 4:1 or 5:1 mix)

Semi-dry, hand-compacted mix ratio adjusted to depth and loading.

SBR bonding agent

Slurry-brushed onto the substrate for bonded screeds under 40mm.

Polypropylene fibre reinforcement

Added to reduce shrinkage cracking on larger bays.

DPM and separating membrane

For unbonded or floating screeds over insulation.

Falls formed to drain outlets

Built into the screed thickness for wet rooms and balconies.

Edge and movement joints

Set at bay lines, doorways and around columns.

FAQs from Burton Bradstock clients

How is sand and cement screed different from liquid screed in Burton Bradstock?+

Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.

Will the screed crack?+

Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Burton Bradstock job.

What SR rating do you achieve on a trowelled screed?+

We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.

Can you match an existing sand and cement floor level?+

Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.

Do you use a screed pump for sand and cement in Burton Bradstock?+

On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.

How long does a sand and cement screed take to dry in Burton Bradstock?+

Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.

Fixed-price sand and cement screed near Burton Bradstock

One quote covers prep, mix, lay and finish. No day-rate surprises on your Burton Bradstock job.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp