Liquid Screed · Dorset

Liquid Screed for West Bay Builds

Liquid screed in West Bay solves what sand-and-cement struggles with — SR1 flatness in a single pour, ready for tilers and joiners within days rather than weeks.

Liquid screed work near Liquid Screed for West Bay Builds
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Liquid Screed for West Bay Builds

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Liquid screed in West Bay solves what sand-and-cement struggles with — SR1 flatness in a single pour, ready for tilers and joiners within days rather than weeks.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Most of our West Bay jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. West Bay sits Exeter (40 mi), and we work the surrounding villages on the same week's diary.

Local facts that shape every West Bay pour

County

Dorset

District

West Dorset

Postcode

DT6

Nearest city

Exeter (40 mi)

Nearest motorway

M5 (J25, ~36 mi)

Primary A-road

B3157

Local industries

working harbour, tourism

Common builds

harbour cottages, seafront apartments

Liquid Screed in West Bay — how it works

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Right fit for West Bay coastal residential and hospitality clients

West Bay is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.

Specifications suited to West Bay builds

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Latest jobs across Dorset

Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Smooth finish on a garden room pour in Exmouth
Smooth finish on a garden room pour in Exmouth
Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter

What backs our West Bay work

Backed by 5★ Google and Yell reviews from across Dorset
Same-day quotes on most residential jobs
10-year Cemfloor manufacturer-supported guarantee on qualifying installs
Direct relationships with local insulation and UFH suppliers — fewer middlemen, fewer surprises

West Bay screed questions, answered

Can other trades work above while you pour?+

We prefer the floor area cleared on pour day, but trades can work in unrelated areas. We'll set out a sensible plan with your site manager.

How quickly can I walk on a liquid screed floor in West Bay?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific West Bay job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any West Bay pour in the colder months.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the West Bay site visit.

Do I need to be on site for the pour in West Bay?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the West Bay access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Pin down a date for your West Bay pour, and we'll handle the rest — pump, mix, lay, level, protect, hand over.

Ready for a laser-flat floor in West Bay?

Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp