Liquid Screed · Dorset
Cemfloor-Certified Liquid Screed Across Beaminster
From Broadwindsor Road Business Park commercial floors to Mosterton self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.
Get a fixed price for Cemfloor-Certified Liquid Screed Across Beaminster
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
From Broadwindsor Road Business Park commercial floors to Mosterton self-builds, liquid screed gives you one continuous slab with no shrinkage cracks and minimal curling.
We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.
Most of our Beaminster jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Beaminster sits Exeter (40 mi), and we work the surrounding villages on the same week's diary.
Liquid Screed in Beaminster — how it works
Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.
Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.
What we plan around in Beaminster
County
Dorset
District
West Dorset
Postcode
DT8
Nearest city
Exeter (40 mi)
Nearest motorway
M5 (J25, ~30 mi)
Primary A-road
A3066
Local industries
Clipper Teas, small manufacturing
Common builds
hamstone Georgian terraces, new estates off Hams Lane
Where liquid screed earns its keep in Beaminster
- Hamstone Georgian terraces — a regular brief in Beaminster
- New estates off Hams Lane — a regular brief in Beaminster
- Small industrial — a regular brief in Beaminster
- Clipper Teas — a regular brief in Beaminster
- Small manufacturing — a regular brief in Beaminster
Beaminster-area projects



How a Beaminster pour runs
- 1
Site visit and written quote — confirm depths, area, access, build-up
- 2
We prep edge insulation, polythene DPM and any UFH coordination
- 3
Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour
- 4
Cover and protect for 24-48 hours
- 5
Light foot traffic from day 2; floor coverings once moisture content is signed off
Why Beaminster clients pick us
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J25, ~30 mi) access window and A3066 traffic patterns
Adjacent areas — usually same-week diary
Specifications suited to Beaminster builds
Cemfloor CT-C30-F6
Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.
Cemfloor Therm
Optimised for underfloor heating with high thermal conductivity.
Acoustic and thermal insulation underlay
PIR, EPS or acoustic mat depending on the build-up.
Edge isolation strip
10mm closed-cell foam to allow thermal movement.
What people in Beaminster usually ask
Does liquid screed crack like sand-and-cement?+
Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.
How quickly can I walk on a liquid screed floor in Beaminster?+
Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Beaminster job.
Can you pour in cold weather?+
Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Beaminster pour in the colder months.
Can liquid screed go over an existing concrete slab?+
Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Beaminster site visit.
Do you offer a guarantee?+
Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.
How long does a Beaminster pour take?+
A typical domestic floor of 80-120m² is pumped, levelled and finished in a single morning. We coordinate access and pump position with you in advance.
Cemfloor-certified work near Beaminster
Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
