Traditional Sand & Cement Screed · Dorset
Traditional Sand & Cement Screed — Wareham, Dorset
Deep make-up floors in Wareham, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.
Get a fixed price for Traditional Sand & Cement Screed — Wareham, Dorset
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Deep make-up floors in Wareham, especially where the sub-base has been dug out or old floor coverings stripped back to an uneven slab, are still best served by a traditional sand and cement screed built up in layers.
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Most of our Wareham jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Wareham sits Poole (10 mi), and we work the surrounding villages on the same week's diary.
Wareham projects we see most
- Georgian townhouses — a regular brief in Wareham
- Stone cottages — a regular brief in Wareham
- Small new-build estates — a regular brief in Wareham
- High-street shop retrofits — a regular brief in Wareham
- Independent retail — a regular brief in Wareham
Who this is for in Wareham
Wareham runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
Traditional Sand & Cement Screed in Wareham — how it works
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Materials and systems we use in Wareham
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
What to expect on pour day in Wareham
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
Latest jobs across Dorset



Nearby villages and towns
What backs our Wareham work
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M27 (~30 mi) access window and A351 traffic patterns
Wareham screed questions, answered
What thickness do you lay for a bonded sand and cement screed?+
Bonded screeds go down from 25mm minimum, unbonded or floating builds from 50mm, and thicker still where we are making up a significant fall or a dug-out sub-base.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How is sand and cement screed different from liquid screed in Wareham?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Wareham job.
How long does a sand and cement screed take to dry in Wareham?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Wareham?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Book a bay-laid screed in Wareham
Hand-trowelled screeds take longer to schedule around drying and access. Get your Wareham job in the diary early.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site