Devon Coverage
Trusham's Cemfloor-Certified Screed Team
Liquid screed in Trusham solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
Liquid screed in Trusham solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're Trusham is a rural parish where careful access and staged pours matter as much as the mix. Our coverage runs across TQ13, taking in Teign Valley and out toward , with the M5 (J31, ~13 mi) on hand for materials and pump trucks.
Most of our Trusham jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Trusham sits Exeter (11 mi), and we work the surrounding villages on the same week's diary.
Typical Trusham use cases
- Stone farmhouses — a regular brief in Trusham
- Barn conversions — a regular brief in Trusham
- Cottage extensions — a regular brief in Trusham
- Occasional new-build cottages — a regular brief in Trusham
- Agriculture — a regular brief in Trusham
Right fit for Trusham rural self-builders and farms
Trusham sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Liquid screed in Trusham — how it works
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Trusham job.
Specifications suited to Trusham builds
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
How a Trusham pour runs
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
Trusham-area projects



Within easy reach of Trusham
Why Trusham clients pick us
What people in Trusham usually ask
Are you fully insured?+
Yes — public liability, employers' liability and CAR cover, with certificates available on request for any Trusham site.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Trusham project and align dates with their pressure-test schedule.
Can you give a fixed-price quote?+
Yes — every Trusham quote is a written fixed price against a defined scope. No day-rate surprises.
Do you cover Trusham?+
Yes — Trusham sits inside our regular 30-mile working radius and we have active diary there most months.
How long does the floor take to dry in Trusham?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Trusham pour.
Can you screed over an existing concrete slab?+
Usually yes — from 30mm bonded if the slab is sound. We'll inspect the substrate at the Trusham site visit.
Cemfloor screed across TQ13
From Trusham to the surrounding villages, one team, one fixed price.
