Devon Coverage
Lynton's Cemfloor-Certified Screed Team
Liquid screed in Lynton solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.

Liquid screed in Lynton solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're Lynton is an Exmoor clifftop town where tricky access and hairpin roads shape every pump plan. Our coverage runs across EX35, taking in North Walk and out toward clifftop hospitality, with the M5 (J27, ~58 mi) on hand for materials and pump trucks.
Most of our Lynton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Lynton sits Barnstaple (18 mi), and we work the surrounding villages on the same week's diary.
Lynton at a glance
County
Devon
District
North Devon
Postcode
EX35
Nearest city
Barnstaple (18 mi)
Nearest motorway
M5 (J27, ~58 mi)
Primary A-road
A39
Local industries
upland farming, holiday lets
Common builds
granite cottages, farmhouse conversions
Liquid screed in Lynton — how it works
On larger Lynton jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
Who this is for in Lynton
Lynton sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Materials and systems we use in Lynton
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Latest jobs across Devon



What backs our Lynton work
Lynton screed questions, answered
Are you fully insured?+
Yes — public liability, employers' liability and CAR cover, with certificates available on request for any Lynton site.
Can you give a fixed-price quote?+
Yes — every Lynton quote is a written fixed price against a defined scope. No day-rate surprises.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Lynton project and align dates with their pressure-test schedule.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Do you cover Lynton?+
Yes — Lynton sits inside our regular 30-mile working radius and we have active diary there most months.
How long does the floor take to dry in Lynton?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Lynton pour.
Within easy reach of Lynton
Lynton jobs run best with a clear scope, a fixed price and a firm date. Send us the brief and we'll come back with all three.
Talk to a Lynton-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
