Devon Coverage
Ivybridge's Cemfloor-Certified Screed Team
Liquid screed in Ivybridge solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
Talk to a Ivybridge-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
Call 07765 71260907765 712609Liquid screed in Ivybridge solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're Ivybridge is a Plymouth-commuter A38 town with big new-build estates and the Lee Mill trade park. Our coverage runs across PL21, taking in Ermington and out toward Lee Mill Industrial Estate, with the M5 (J31, ~33 mi) on hand for materials and pump trucks.
Most of our Ivybridge jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Ivybridge sits Plymouth (10 mi), and we work the surrounding villages on the same week's diary.
Who this is for in Ivybridge
Ivybridge runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.
Ivybridge at a glance
County
Devon
District
South Hams
Postcode
PL21
Nearest city
Plymouth (10 mi)
Nearest motorway
M5 (J31, ~33 mi)
Primary A-road
A38
Local industries
commuter, distribution
Common builds
large new estates, paper-mill heritage
Liquid screed in Ivybridge — how it works
On larger Ivybridge jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
What to expect on pour day in Ivybridge
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
Recent work near Ivybridge



Materials and systems we use in Ivybridge
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Within easy reach of Ivybridge
FAQs from Ivybridge clients
How long does the floor take to dry in Ivybridge?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Ivybridge pour.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Ivybridge project and align dates with their pressure-test schedule.
Do you cover Ivybridge?+
Yes — Ivybridge sits inside our regular 30-mile working radius and we have active diary there most months.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Can you give a fixed-price quote?+
Yes — every Ivybridge quote is a written fixed price against a defined scope. No day-rate surprises.
How quickly can you start on a Ivybridge job?+
Diary is usually 2-4 weeks. We'll give you a firm date with your quote.
Trust points for a Ivybridge brief
Talk to a Ivybridge-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
