Traditional Sand & Cement Screed · Devon
Exmouth Traditional Sand & Cement Screed Specialists
For Exmouth jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
Talk through your Exmouth sand and cement job
No pump access, an awkward fall, or a wet area, call and we'll talk through the right build-up for your Exmouth floor.
Call 07791 51084907791 510849 WhatsApp usGet a fixed price for Exmouth Traditional Sand & Cement Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
For Exmouth jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
For Exmouth wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Most of our Exmouth jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Exmouth sits Exeter (11 mi), and we work the surrounding villages on the same week's diary.
Right fit for Exmouth coastal residential and hospitality clients
Exmouth is a coastal town, so damp control, salt exposure and tight winter pour windows shape every brief. We work the diary around that — and around the holiday-let turnover that funds half the jobs here.
Exmouth at a glance
County
Devon
District
East Devon
Postcode
EX8
Nearest city
Exeter (11 mi)
Nearest motorway
M5 (J30, ~9 mi)
Primary A-road
A376
Local industries
marina, tourism lets
Common builds
seafront apartments, 1930s coastal semis
Traditional Sand & Cement Screed in Exmouth — how it works
Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
How a Exmouth pour runs
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
Recent work near Exmouth



Specifications suited to Exmouth builds
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Within easy reach of Exmouth
FAQs from Exmouth clients
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Exmouth job.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
How is sand and cement screed different from liquid screed in Exmouth?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
How long does a sand and cement screed take to dry in Exmouth?+
Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.
Do you use a screed pump for sand and cement in Exmouth?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Trust points for a Exmouth brief
Hundreds of square metres poured around Exmouth in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Talk through your Exmouth sand and cement job
No pump access, an awkward fall, or a wet area, call and we'll talk through the right build-up for your Exmouth floor.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site