Traditional Sand & Cement Screed · Somerset

Traditional Sand & Cement Screed Poured to SR1 in Cheddon Fitzpaine

Cheddon Fitzpaine builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Traditional Sand & Cement Screed Poured to SR1 in Cheddon Fitzpaine

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Cheddon Fitzpaine builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

Most of our Cheddon Fitzpaine jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Cheddon Fitzpaine sits Taunton (3 mi), and we work the surrounding villages on the same week's diary.

Common briefs across Cheddon Fitzpaine

  • 1930s semis — a regular brief in Cheddon Fitzpaine
  • Estate new-builds — a regular brief in Cheddon Fitzpaine
  • Kitchen-diner extensions — a regular brief in Cheddon Fitzpaine
  • Garden-room outbuildings — a regular brief in Cheddon Fitzpaine
  • Local retail — a regular brief in Cheddon Fitzpaine

Who this is for in Cheddon Fitzpaine

Cheddon Fitzpaine is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.

Traditional Sand & Cement Screed in Cheddon Fitzpaine — how it works

Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

Materials and systems we use in Cheddon Fitzpaine

Sand and cement (typically 4:1 or 5:1 mix)

Semi-dry, hand-compacted mix ratio adjusted to depth and loading.

SBR bonding agent

Slurry-brushed onto the substrate for bonded screeds under 40mm.

Polypropylene fibre reinforcement

Added to reduce shrinkage cracking on larger bays.

DPM and separating membrane

For unbonded or floating screeds over insulation.

Falls formed to drain outlets

Built into the screed thickness for wet rooms and balconies.

Edge and movement joints

Set at bay lines, doorways and around columns.

What to expect on pour day in Cheddon Fitzpaine

  1. 1

    Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach

  2. 2

    Substrate prep, priming or DPM, and setting out of bay lines and laser levels

  3. 3

    Mix and place the screed in bays, compacting as we go to remove voids

  4. 4

    Hand float or power trowel to a flat, dense SR2 finish

  5. 5

    Protect and allow to cure, typically a day per millimetre of depth after the first 50mm

  6. 6

    Follow-up inspection before floor coverings or tiling begin

Recent work near Cheddon Fitzpaine

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton

Trust points for a Cheddon Fitzpaine brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Cheddon Fitzpaine-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

FAQs from Cheddon Fitzpaine clients

What SR rating do you achieve on a trowelled screed?+

We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.

How is sand and cement screed different from liquid screed in Cheddon Fitzpaine?+

Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.

Will the screed crack?+

Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Cheddon Fitzpaine job.

Can you match an existing sand and cement floor level?+

Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.

How long does a sand and cement screed take to dry in Cheddon Fitzpaine?+

Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.

Do you use a screed pump for sand and cement in Cheddon Fitzpaine?+

On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.

Book a bay-laid screed in Cheddon Fitzpaine

Hand-trowelled screeds take longer to schedule around drying and access. Get your Cheddon Fitzpaine job in the diary early.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp