New Build Screeding · Somerset
New Build Screeding Poured to SR1 in Cheddon Fitzpaine
Developers building across Cheddon Fitzpaine need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Get a fixed price for New Build Screeding Poured to SR1 in Cheddon Fitzpaine
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Developers building across Cheddon Fitzpaine need a screed contractor who understands plot handover dates, not just square metreage. We plan pours around your build programme from day one.
Output on a typical Cheddon Fitzpaine plot run is several units per day depending on floor area and pump access, with our crew moving between plots as each pour cures under protection.
Most of our Cheddon Fitzpaine jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Cheddon Fitzpaine sits Taunton (3 mi), and we work the surrounding villages on the same week's diary.
Cheddon Fitzpaine projects we see most
- 1930s semis — a regular brief in Cheddon Fitzpaine
- Estate new-builds — a regular brief in Cheddon Fitzpaine
- Kitchen-diner extensions — a regular brief in Cheddon Fitzpaine
- Garden-room outbuildings — a regular brief in Cheddon Fitzpaine
- Local retail — a regular brief in Cheddon Fitzpaine
Who this is for in Cheddon Fitzpaine
Cheddon Fitzpaine is residential-heavy, with renovation, extension and self-build briefs dominating the diary. We work directly with homeowners and their builders, with a single point of contact for the screed package.
New Build Screeding in Cheddon Fitzpaine — how it works
New build UFH, screed depth and floor build-up are agreed with your architect and M&E consultant once, then repeated consistently across every plot in the Cheddon Fitzpaine scheme, so plot 1 and plot 40 come out identical.
We work from the site programme, not just the drawings, agreeing pump positions, plot order and waste routes with the site manager before mobilising, so a Cheddon Fitzpaine development moves through screed without a gap in the build sequence.
Materials and systems we use in Cheddon Fitzpaine
Cemfloor CT-C30-F6
Standard cement-based liquid screed for repeat plot pours.
Cemfloor Therm
Where the development spec includes underfloor heating as standard.
Insulation to development U-value spec
PIR or EPS specified once and repeated across every plot.
Edge isolation strip
Fitted to a consistent standard detail across the whole site.
DPM to NHBC/warranty provider standard
Matched to the site's chosen warranty provider requirements.
Plot-by-plot moisture test kit
CM testing to hand over each unit with its own written record.
What to expect on pour day in Cheddon Fitzpaine
- 1
Pre-start meeting with the developer or main contractor to agree plot sequence, pump access and programme dates
- 2
Confirm build-up once with the architect and M&E consultant, then apply it consistently across every plot
- 3
Mobilise crew and pump to move plot to plot, pumping and levelling each unit in turn
- 4
Protect each plot for 24-48 hours while the crew moves on to the next
- 5
Moisture testing and a written handover record issued per plot
- 6
Snagging and any remedial work coordinated directly with the site manager before final trades move in
Floors poured around Cheddon Fitzpaine



Nearby villages and towns
Proof from the Somerset workload
Common Cheddon Fitzpaine build questions
Are you set up for NHBC or LABC warranty requirements?+
Yes, our build-ups and documentation are prepared to match whichever warranty provider your Cheddon Fitzpaine development is registered with.
Do you provide RAMS for a new build site in Cheddon Fitzpaine?+
Yes, full RAMS, COSHH documentation and insurance details are issued ahead of mobilisation, formatted for your CDM principal contractor.
How do you hand over moisture readings on a multi-plot job?+
Each plot gets its own CM-test record and written sign-off, so your flooring contractor or NHBC inspector has a clear document per unit, not one blanket certificate for the site.
How many plots can you screed per day on a Cheddon Fitzpaine development?+
It depends on floor area and pump access, but a typical crew moves through several plots a day on a standard housing scheme, with output agreed against your programme at the pre-start meeting.
Do you price the whole Cheddon Fitzpaine site or plot by plot?+
Both, most developers prefer a single development-wide package with a per-plot rate, so instructing extra plots later is straightforward and there's no re-quoting for every unit.
Can you keep the same build-up across every plot?+
Yes, we agree the specification once with your architect or M&E consultant and repeat it consistently, so plot 1 and the last plot on the Cheddon Fitzpaine site come out to the same depth and finish.
Book your Cheddon Fitzpaine development into the diary
Multi-plot schemes need booking well ahead. Reserve your Cheddon Fitzpaine pour dates now and we'll confirm logistics with your site manager.