Traditional Sand & Cement Screed · Devon

Traditional Sand & Cement Screed Poured to SR1 in Broadhembury

Broadhembury builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Liquid screed work near Traditional Sand & Cement Screed Poured to SR1 in Broadhembury
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Traditional Sand & Cement Screed Poured to SR1 in Broadhembury

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Broadhembury builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

Most of our Broadhembury jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Broadhembury sits Honiton (5 mi), and we work the surrounding villages on the same week's diary.

Why Broadhembury site context matters

County

Devon

District

East Devon

Postcode

EX14

Nearest city

Honiton (5 mi)

Nearest motorway

M5 (J28, ~7 mi)

Primary A-road

minor B-roads

Local industries

Drewe Estate, equestrian

Common builds

Drewe-estate cottages, listed thatch

Traditional Sand & Cement Screed in Broadhembury — how it works

Unlike a self-levelling liquid screed, sand and cement is placed and compacted by hand, so we control the fall towards a drain, form an upstand at a threshold, or feather it into an existing floor level in a way a pumped pour cannot.

Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.

Built for Broadhembury rural self-builders and farms

Broadhembury sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Cemfloor systems for Broadhembury

Sand and cement (typically 4:1 or 5:1 mix)

Semi-dry, hand-compacted mix ratio adjusted to depth and loading.

SBR bonding agent

Slurry-brushed onto the substrate for bonded screeds under 40mm.

Polypropylene fibre reinforcement

Added to reduce shrinkage cracking on larger bays.

DPM and separating membrane

For unbonded or floating screeds over insulation.

Falls formed to drain outlets

Built into the screed thickness for wet rooms and balconies.

Edge and movement joints

Set at bay lines, doorways and around columns.

Recent work near Broadhembury

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton
Self-build UFH pour near Tiverton
Self-build UFH pour near Tiverton

Trust points for a Broadhembury brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Broadhembury-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

FAQs from Broadhembury clients

How is sand and cement screed different from liquid screed in Broadhembury?+

Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.

What SR rating do you achieve on a trowelled screed?+

We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.

Will the screed crack?+

Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Broadhembury job.

How long does a sand and cement screed take to dry in Broadhembury?+

Roughly a day per millimetre of depth once past the first 50mm, so a 65mm floor is typically ready for coverings in around six to eight weeks, depending on ventilation and site conditions.

Can you match an existing sand and cement floor level?+

Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.

Do you use a screed pump for sand and cement in Broadhembury?+

On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.

Whether it's a single wet room or a full rural self-builders and farms scheme in Broadhembury, we set out bays, control the falls and hand back a dense, SR2-flat floor ready for tiling.

Fixed-price sand and cement screed near Broadhembury

One quote covers prep, mix, lay and finish. No day-rate surprises on your Broadhembury job.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp