Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed in Awliscombe
For Awliscombe jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
Talk through your Awliscombe sand and cement job
No pump access, an awkward fall, or a wet area, call and we'll talk through the right build-up for your Awliscombe floor.
Call 07791 51084907791 510849 WhatsApp usGet a fixed price for Traditional Sand & Cement Screed in Awliscombe
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
For Awliscombe jobs where gypsum-based screed is ruled out, wet rooms, balconies, timber-sensitive junctions, we lay a semi-dry sand and cement mix, bay by bay, finished to SR2 with a hand float or power trowel.
For Awliscombe wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
Most of our Awliscombe jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Awliscombe sits Exeter (16 mi), and we work the surrounding villages on the same week's diary.
Built for Awliscombe rural self-builders and farms
Awliscombe sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.
Local facts that shape every Awliscombe pour
County
Devon
District
East Devon
Postcode
EX14
Nearest city
Exeter (16 mi)
Nearest motorway
M5 (J28, ~12 mi)
Primary A-road
A373
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Traditional Sand & Cement Screed in Awliscombe — how it works
For Awliscombe wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Step-by-step for a Awliscombe job
- 1
Site visit to assess substrate, falls, depth and access, since sand and cement can be barrowed where a pump truck cannot reach
- 2
Substrate prep, priming or DPM, and setting out of bay lines and laser levels
- 3
Mix and place the screed in bays, compacting as we go to remove voids
- 4
Hand float or power trowel to a flat, dense SR2 finish
- 5
Protect and allow to cure, typically a day per millimetre of depth after the first 50mm
- 6
Follow-up inspection before floor coverings or tiling begin
Floors poured around Awliscombe



Cemfloor systems for Awliscombe
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Other areas we cover near Awliscombe
Common Awliscombe build questions
Can sand and cement screed go over underfloor heating?+
It can, though thermal response is slower than a liquid screed because of the voids that form around hand-laid pipework. For Awliscombe UFH jobs we will usually recommend liquid screed unless there is a specific reason to use sand and cement.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Awliscombe job.
How is sand and cement screed different from liquid screed in Awliscombe?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
Do you use a screed pump for sand and cement in Awliscombe?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Proof from the Devon workload
Hundreds of square metres poured around Awliscombe in the last 12 months
Single-team continuity — same crew, same standards, every job
Written fixed-price quotes — no day-rate creep
Moisture-test handover record so flooring contractors take the slab on without dispute
Talk through your Awliscombe sand and cement job
No pump access, an awkward fall, or a wet area, call and we'll talk through the right build-up for your Awliscombe floor.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site