Garage Conversions & New Slabs · Somerset
Cement-Based Garage Floor Screed Street
Liquid screed for garage conversions and new garage floors.
Get a fixed price for Cement-Based Garage Floor Screed Street
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Garage floors in Street used as workshops need a hard-wearing surface. Cemfloor CT-C30-F6 handles vehicle traffic, tool weight and dropped-spanner abuse.
Garage pours in Street are small, awkward and important. Small because the room's usually 15–25m². Awkward because you're often pouring over an old slab that never expected to be a living-room floor. Important because the finish decides how the whole conversion feels.
Turning a Street garage into a habitable room needs three floor problems solving at once — level, damp and UFH-response. Liquid screed handles all three.
Garage Floor Screed in Street — how it works
For new garage slabs in Street the build-up runs full: 100mm PIR insulation, DPM, UFH clipped and pressure-tested, edge strip, then 65mm Cemfloor. Ready for foot traffic in 48 hours, tile or LVT once moisture-tested.
The finish suits everything: tile, LVT, engineered wood, painted floor, sealed slab. On Street workshop conversions we sometimes leave it as a sealed screed with a top coat and that's the finished floor.
BA16 logistics and access for garage floor screed pours
County
Somerset
District
Somerset
Postcode
BA16
Nearest city
Bridgwater (10 mi)
Nearest motorway
M5 (J23, ~13 mi)
Primary A-road
A39
Sector focus
Garage Floor Screed
Common local briefs
Georgian townhouses, stone cottages
Typical garage floor screed projects around Street
- Garage-to-living-room conversions in Street
- Garage-to-home-office conversions across BA16
- New detached garage slabs around Street
- Garage-to-utility-room pours in Street
- Workshop and gym floors on Street properties
Recent garage floor screed work near Street



What pour day looks like on a Street garage floor screed job
- 1
Site visit to check the existing slab or build-up plan
- 2
Written fixed-price quote against depth and build-up
- 3
Prep — priming and low-spot filling on retrofits
- 4
Half-morning pump pour with laser levelling
- 5
Cover, cure and handover to the fit-out trades
What backs our Street garage floor screed work
Garage-conversion focus across Somerset — direct-client fixed pricing
Small-pump kit for tight garage-door access
Coordinated with UFH installers on retrofit systems
Threshold-aware depth planning laser-checked on site
Other Street-area places we cover for this
Materials and systems for Street garage floor screed
Cemfloor CT-C30-F4
Standard garage-conversion mix, quick to trade back.
Cemfloor CT-C30-F6
Higher strength for {town} workshop and gym floors seeing heavy loading.
Primer + repair mortar
Applied on retrofit garage slabs for bond and levelling.
Perimeter edge strip
Continuous around walls and door threshold.
What people in Street ask about this
Do you supply the build-up for new garages?+
Optional — we'll price insulation, DPM and edge strip if you want a single sub on the floor package for your Street garage.
How long does a garage pour take?+
Half a morning on site for a typical 20–25m² Street garage conversion.
Can I leave it as an exposed floor?+
Yes — sealed and coated it works fine for Street workshops, gyms and utility rooms.
Do I need UFH under the floor?+
Recommended for garage-to-living-room conversions in Street. We work with your UFH installer on the pipe layout.
Can you screed over my existing Street garage slab?+
Usually yes — bonded from 40mm on a primed, sound existing slab. Site visit first to confirm the Street garage floor is fit to bond.
Can I use it as a workshop or gym?+
Yes — Cemfloor CT-C30-F6 handles heavy point loads and vehicle traffic on a Street workshop floor.
Garage-conversion screed across BA16
One morning, one crew, laser-flat — from garage to living room.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
