Traditional Sand & Cement Screed · Devon
Traditional Sand & Cement Screed — Seaton, Devon
Seaton builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Get a fixed price for Traditional Sand & Cement Screed — Seaton, Devon
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Seaton builders sometimes need a screed that can be laid in a bucket-and-barrow operation with no pump access, or that has to tie into an external step, drain or wet room upstand. That is exactly where sand and cement wins over a liquid pour.
Sand and cement screed is laid in bays with day joints, which we set out to avoid future cracking at natural stress points such as doorways and changes in depth. It is a more labour-intensive process than liquid screed, but it is proven, robust and unaffected by moisture the way calcium sulphate screeds can be.
Most of our Seaton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Seaton sits Exeter (24 mi), and we work the surrounding villages on the same week's diary.
EX12 access, routes and logistics
County
Devon
District
East Devon
Postcode
EX12
Nearest city
Exeter (24 mi)
Nearest motorway
M5 (J25, ~22 mi)
Primary A-road
A3052
Local industries
retirement living, tourism
Common builds
coastal apartments, retirement bungalows
What Seaton builds usually need
- Coastal apartments — a regular brief in Seaton
- Retirement bungalows — a regular brief in Seaton
- Seafront cafés — a regular brief in Seaton
- Retirement living — a regular brief in Seaton
- Tourism — a regular brief in Seaton
Traditional Sand & Cement Screed in Seaton — how it works
For Seaton wet rooms, balconies and any area with sustained water contact, sand and cement is usually the only sensible screed choice, since gypsum-based liquid screeds are not designed to tolerate standing water.
We mix a semi-dry sand and cement screed on site or bring it in via a screed pump, lay it to string lines or laser-set pins in bays, then compact and trowel it to a flat, dense surface. It is slower than a liquid pour, roughly a day of drying time per millimetre of depth once you get past the first 50mm, but it tolerates a much wider range of site conditions.
Specifications suited to Seaton builds
Sand and cement (typically 4:1 or 5:1 mix)
Semi-dry, hand-compacted mix ratio adjusted to depth and loading.
SBR bonding agent
Slurry-brushed onto the substrate for bonded screeds under 40mm.
Polypropylene fibre reinforcement
Added to reduce shrinkage cracking on larger bays.
DPM and separating membrane
For unbonded or floating screeds over insulation.
Falls formed to drain outlets
Built into the screed thickness for wet rooms and balconies.
Edge and movement joints
Set at bay lines, doorways and around columns.
Floors poured around Seaton



Seaton-area service radius
Proof from the Devon workload
Common Seaton build questions
Can you form a fall to a drain with sand and cement?+
Yes, this is one of the main reasons to choose it. We build the fall into the screed thickness during placement, which liquid screed cannot do since it self-levels flat.
How is sand and cement screed different from liquid screed in Seaton?+
Sand and cement is a semi-dry mix, hand-laid and trowelled in bays, whereas liquid screed is pumped and self-levels. Sand and cement suits deep fills, external areas and wet rooms; liquid screed suits large flat internal floors that need to dry quickly.
What SR rating do you achieve on a trowelled screed?+
We finish sand and cement to SR2, within 3mm under a 2m straight edge, which is suitable for most tiled finishes. If you need SR1 flatness for large-format tile or resin, liquid screed is usually the better route.
Will the screed crack?+
Bay joints and fibre reinforcement control shrinkage cracking. We set bay sizes and joint positions at doorways and depth changes to minimise the risk on any Seaton job.
Do you use a screed pump for sand and cement in Seaton?+
On larger jobs, yes, a screed pump can deliver the semi-dry mix into the building, which speeds up placement while keeping the hand-trowelled finish.
Can you match an existing sand and cement floor level?+
Yes, we set datums off your existing finished floor level and build the new screed to match, allowing for whatever covering goes on top.
Sand and cement screed still has a firm place in Seaton building work, wet rooms, external thresholds and deep fills all reward a hand-laid, trowelled finish over a fast liquid pour.
Wet room or balcony screed in EX12?
Falls to drain, external thresholds, deep fills, we quote Traditional Sand & Cement Screed for coastal residential and hospitality clients jobs across Seaton and the surrounding villages.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700