Renovation Screed · Somerset

Renovation Screed — Rockwell Green, Somerset

Across Rockwell Green we lay overlay and replacement screeds for renovations from period cottages to 1960s semis, using thin-section liquid pours where ceiling heights or thresholds are constrained.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Renovation Screed — Rockwell Green, Somerset

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Rockwell Green we lay overlay and replacement screeds for renovations from period cottages to 1960s semis, using thin-section liquid pours where ceiling heights or thresholds are constrained.

Old buildings move differently. We talk through movement joints at thresholds and against existing walls, so the new floor doesn't fight the old structure.

Most of our Rockwell Green jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Rockwell Green sits Taunton (7 mi), and we work the surrounding villages on the same week's diary.

Renovation Screed in Rockwell Green — how it works

Renovation pours typically run unbonded over insulation, with edge isolation against existing walls. We can lay from 35mm where headroom is tight, or full 65-75mm builds where the room can take it.

Where you're stripping back to a sound original slab in Rockwell Green, we'll prep, prime and bond a thin liquid screed straight onto it from 30mm — no need to dig out.

Rockwell Green at a glance

County

Somerset

District

Somerset West and Taunton

Postcode

TA21

Nearest city

Taunton (7 mi)

Nearest motorway

M5 (J26, ~2 mi)

Primary A-road

A38

Local industries

local retail, school and community builds

Common builds

1930s semis, estate new-builds

Typical Rockwell Green use cases

  • 1930s semis — a regular brief in Rockwell Green
  • Estate new-builds — a regular brief in Rockwell Green
  • Kitchen-diner extensions — a regular brief in Rockwell Green
  • Garden-room outbuildings — a regular brief in Rockwell Green
  • Local retail — a regular brief in Rockwell Green

Latest jobs across Somerset

Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton

How a Rockwell Green pour runs

  1. 1

    Site visit — inspect substrate, threshold heights, structural movement

  2. 2

    Strip and prep, or prime existing slab

  3. 3

    Insulation, UFH coordination and edge isolation

  4. 4

    Pour, level and protect

  5. 5

    Floor coverings once dry and signed off

What backs our Rockwell Green work

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Somerset — fresh Rockwell Green-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

Specifications suited to Rockwell Green builds

Cemfloor CT-C30-F6 (thin-section)

Where minimum depth matters more than maximum mass.

Cemfloor Therm

Retro-fit UFH in renovation builds.

Acoustic underlay

Critical for {town} flat conversions where impact noise is a concern.

Self-levelling overlay primer

For bonded thin-section pours over existing slabs.

Rockwell Green screed questions, answered

How do you handle threshold heights in older Rockwell Green properties?+

We design the build-up around your target finished-floor level — including covering thickness — so doors still swing and thresholds still meet. Often that means thinner insulation and a thinner screed.

Can you screed over my existing concrete floor in Rockwell Green?+

Usually yes — if the slab is sound we bond a thin liquid screed straight on top from 30mm. We'll assess the Rockwell Green substrate at the site visit and price accordingly.

Can you do a single room rather than the whole house?+

Yes — single-room renovation pours are a regular run for us across Rockwell Green, with movement joints at the doorway to isolate from neighbouring rooms.

Is liquid screed safe over a heritage property in Rockwell Green?+

With proper edge isolation and movement joints, yes. We discuss any conservation-area or listed-building constraints up front.

Will the screed stick to my old skirtings?+

We fit edge isolation strip against every wall before the pour — no bonding to skirtings, no risk to plaster.

Will it work with my new UFH retro-fit?+

Yes — Cemfloor Therm at 50mm above pipe gives you full UFH performance in a renovation build-up most original structures can accommodate.

Cemfloor-certified work near Rockwell Green

Manufacturer-backed install, ten-year guarantee, fully insured. Get a written quote.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp