Dorset Coverage
Poundbury's Cemfloor-Certified Screed Team
Liquid screed in Poundbury solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
Liquid screed in Poundbury solves the flatness, speed and UFH-response problems that traditional sand-and-cement can't.
We're Poundbury is a purpose-built Dorset urban extension where classical detailing and precise UFH pours go hand in hand. Our coverage runs across DT1, taking in Middle Farm and out toward Queen Mother Square trades, with the M5 (J25, ~46 mi) on hand for materials and pump trucks.
Most of our Poundbury jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Poundbury sits Dorchester (1 mi), and we work the surrounding villages on the same week's diary.
Liquid screed in Poundbury — how it works
Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Poundbury job.
On larger Poundbury jobs we mobilise a static mixer; on residential we use ready-mix delivery and a smaller pump. Either way, the finished floor reads the same.
Why Poundbury site context matters
County
Dorset
District
Dorset
Postcode
DT1
Nearest city
Dorchester (1 mi)
Nearest motorway
M5 (J25, ~46 mi)
Primary A-road
A35
Local industries
local retail, school and community builds
Common builds
1930s semis, estate new-builds
Poundbury projects we see most
- 1930s semis — a regular brief in Poundbury
- Estate new-builds — a regular brief in Poundbury
- Kitchen-diner extensions — a regular brief in Poundbury
- Garden-room outbuildings — a regular brief in Poundbury
- Local retail — a regular brief in Poundbury
Latest jobs across Dorset



Step-by-step for a Poundbury job
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
What backs our Poundbury work
Nearby villages and towns
Cemfloor systems for Poundbury
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Poundbury screed questions, answered
Do you handle the insulation and DPM?+
Yes if you want a single sub on the floor build-up, or no if your main contractor has it covered. Either works for Poundbury jobs.
How long does the floor take to dry in Poundbury?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Poundbury pour.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Poundbury project and align dates with their pressure-test schedule.
Can you give a fixed-price quote?+
Yes — every Poundbury quote is a written fixed price against a defined scope. No day-rate surprises.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Do you cover Poundbury?+
Yes — Poundbury sits inside our regular 30-mile working radius and we have active diary there most months.
Talk to a Poundbury-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
