Commercial Screed · Somerset
Merriott Commercial Screed Specialists
Commercial floors in Merriott live or die on flatness and turnaround — liquid screed gives main contractors both, with no bays, no cold joints, and trades back on the floor by day 2.
Get a fixed price for Merriott Commercial Screed Specialists
30 seconds. We'll come back same-day with a fixed price and next available date.
Or call our landline on 01392 237700
Commercial floors in Merriott live or die on flatness and turnaround — liquid screed gives main contractors both, with no bays, no cold joints, and trades back on the floor by day 2.
For commercial UFH we coordinate with the M&E contractor to pressure-test pipes the day before, then screed at the depth specified by the heating consultant.
Most of our Merriott jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Merriott sits Taunton (16 mi), and we work the surrounding villages on the same week's diary.
Commercial Screed in Merriott — how it works
On larger sites in Merriott we run our own moisture testing and hand the floor over with a written CM-test record so the flooring contractor can take it on without dispute.
Whether it's a single retail unit at Merriott Business Park or a 2,000m² distribution centre, the build-up is the same — DPM, insulation, screed, all to SR1.
Merriott at a glance
County
Somerset
District
Somerset
Postcode
TA16
Nearest city
Taunton (16 mi)
Nearest motorway
A303
Primary A-road
A303
Local industries
agriculture, equestrian yards
Common builds
stone farmhouses, barn conversions
Typical Merriott use cases
- Stone farmhouses — a regular brief in Merriott
- Barn conversions — a regular brief in Merriott
- Cottage extensions — a regular brief in Merriott
- Occasional new-build cottages — a regular brief in Merriott
- Agriculture — a regular brief in Merriott
Merriott-area projects



What to expect on pour day in Merriott
- 1
Pre-start meeting with main contractor — programme, access, pump position, waste route
- 2
Substrate prep, DPM and insulation install (us or the main contractor)
- 3
Pour day: 30-50m³ pumped, levelled, spike-rolled per day
- 4
48-hour cure under protection
- 5
Moisture testing and handover record once dry
Why Merriott clients pick us
Within easy reach of Merriott
Materials and systems we use in Merriott
Cemfloor CT-C30-F6
High-strength cement-based screed — preferred for commercial loading.
Cemfloor Therm
For commercial UFH installations.
Heavy-duty PIR insulation
100-150mm to hit commercial U-value targets.
Movement joints
Set at doorway thresholds and around columns to manage thermal expansion.
What people in Merriott usually ask
What's the cost vs traditional screed at scale?+
On commercial jobs the speed and labour saving usually make liquid screed cheaper overall, even before counting the programme value of getting trades back faster.
Do you handle the insulation and DPM as well?+
We can — many Merriott main contractors prefer a single sub on the floor build-up. We'll price it either way.
Can you work weekends or out-of-hours in Merriott?+
We do — retail fit-outs and live-environment jobs often need it. Weekend pours are quoted at a premium but we'll plan the programme with you.
What's your daily output on a commercial Merriott job?+
Typically 30-50m³ per pour day with a single team — that's roughly 600-900m² at 50mm depth. Bigger pours are coordinated with multiple deliveries.
Are you Cemfloor-certified for commercial work?+
Yes — fully certified installer, with manufacturer support on every Merriott commercial job and the 10-year guarantee on qualifying installs.
What about phased pours on live commercial sites?+
Common in Merriott retail work — we phase by zone, with day joints managed correctly so the finished floor still reads as one slab.
Ready for a laser-flat floor in Merriott?
Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.
Ready to get a price?
Tell us the rough size and location — we'll come back with a fixed quote today.
Or call our landline on 01392 237700
Related on this site
