Commercial Screed · Devon

Cemfloor-Certified Commercial Screed Across Feniton

Feniton commercial fit-outs and new-builds need an SR1 floor for vinyl, LVT and large-format tile — liquid screed lays that flatness in one pour, every time.

Book your Feniton pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Reserve a date07791 510849 WhatsApp us
Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Cemfloor-Certified Commercial Screed Across Feniton

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Feniton commercial fit-outs and new-builds need an SR1 floor for vinyl, LVT and large-format tile — liquid screed lays that flatness in one pour, every time.

We mobilise a static mixer and pump truck for larger Feniton commercial sites, pumping 30-50m³ per day with a small crew. The screed is laid, levelled and spike-rolled in continuous bays of any size.

Most of our Feniton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Feniton sits Honiton (4 mi), and we work the surrounding villages on the same week's diary.

Built for Feniton homeowners and contractors alike

Feniton runs a healthy mix of residential renovation and small-to-medium commercial fit-out. We price both, and run both with the same fixed-price approach.

Local facts that shape every Feniton pour

County

Devon

District

East Devon

Postcode

EX14

Nearest city

Honiton (4 mi)

Nearest motorway

M5 (J28, ~10 mi)

Primary A-road

B3174

Local industries

commuter rail, agriculture

Common builds

station-side new estates, listed manor outbuildings

Commercial Screed in Feniton — how it works

For commercial UFH we coordinate with the M&E contractor to pressure-test pipes the day before, then screed at the depth specified by the heating consultant.

On larger sites in Feniton we run our own moisture testing and hand the floor over with a written CM-test record so the flooring contractor can take it on without dispute.

Step-by-step for a Feniton job

  1. 1

    Pre-start meeting with main contractor — programme, access, pump position, waste route

  2. 2

    Substrate prep, DPM and insulation install (us or the main contractor)

  3. 3

    Pour day: 30-50m³ pumped, levelled, spike-rolled per day

  4. 4

    48-hour cure under protection

  5. 5

    Moisture testing and handover record once dry

Recent work near Feniton

Commercial pour at Heathfield, Newton Abbot
Commercial pour at Heathfield, Newton Abbot
Renovation screed for a barn conversion near Honiton
Renovation screed for a barn conversion near Honiton
Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton

Cemfloor systems for Feniton

Cemfloor CT-C30-F6

High-strength cement-based screed — preferred for commercial loading.

Cemfloor Therm

For commercial UFH installations.

Heavy-duty PIR insulation

100-150mm to hit commercial U-value targets.

Movement joints

Set at doorway thresholds and around columns to manage thermal expansion.

FAQs from Feniton clients

What about phased pours on live commercial sites?+

Common in Feniton retail work — we phase by zone, with day joints managed correctly so the finished floor still reads as one slab.

What's your daily output on a commercial Feniton job?+

Typically 30-50m³ per pour day with a single team — that's roughly 600-900m² at 50mm depth. Bigger pours are coordinated with multiple deliveries.

Are you Cemfloor-certified for commercial work?+

Yes — fully certified installer, with manufacturer support on every Feniton commercial job and the 10-year guarantee on qualifying installs.

Do you handle the insulation and DPM as well?+

We can — many Feniton main contractors prefer a single sub on the floor build-up. We'll price it either way.

Can you work weekends or out-of-hours in Feniton?+

We do — retail fit-outs and live-environment jobs often need it. Weekend pours are quoted at a premium but we'll plan the programme with you.

Do you provide RAMS and method statements for Feniton sites?+

Yes — full RAMS, COSHH and insurance documentation issued ahead of mobilisation, formatted for your CDM principal contractor.

Trust points for a Feniton brief

  1. 01Cemfloor-certified, fully insured, CDM-aware
  2. 02Coordinated with most South West UFH installers
  3. 03Pre-start meeting standard on every commercial job
  4. 04Local knowledge — we know the M5 (J28, ~10 mi) access window and B3174 traffic patterns

Book your Feniton pour

Diary fills two to four weeks ahead. Pin a date now and we'll confirm logistics.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp