Devon Coverage
Crediton Liquid Screed Specialists
Crediton clients pick us because we run jobs as fixed-price work, not day-rate guesswork. Quote in writing, date in the diary, pour, hand over.
Talk to a Crediton-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
Call 07765 71260907765 712609Crediton clients pick us because we run jobs as fixed-price work, not day-rate guesswork. Quote in writing, date in the diary, pour, hand over.
We're Crediton is a Mid Devon market town where self-builds and stable conversions are common. Our coverage runs across EX17, taking in Sandford and out toward Crediton Business Park, with the M5 (J31, ~10 mi) on hand for materials and pump trucks.
Most of our Crediton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Crediton sits Exeter (8 mi), and we work the surrounding villages on the same week's diary.
Liquid screed in Crediton — how it works
We pour Cemfloor liquid screed at SR1 flatness, pumping straight off the truck into the building. No hand-trowelled bays, no cold joints, ready for trades back on the floor in 48 hours.
Build-up is straightforward: insulation, DPM, edge isolation, pour. We handle the lot or we work to the main contractor's substrate — whichever suits your Crediton job.
What we plan around in Crediton
County
Devon
District
Mid Devon
Postcode
EX17
Nearest city
Exeter (8 mi)
Nearest motorway
M5 (J31, ~10 mi)
Primary A-road
A377
Local industries
agriculture, construction supply
Common builds
cob-and-thatch cottages, modern self-builds
Where liquid screed earns its keep in Crediton
- Cob-and-thatch cottages — a regular brief in Crediton
- Modern self-builds — a regular brief in Crediton
- Equestrian outbuildings — a regular brief in Crediton
- Agriculture — a regular brief in Crediton
- Construction supply — a regular brief in Crediton
Latest jobs across Devon



How a Crediton pour runs
- 1
Site visit and written quote
- 2
Prep — insulation, DPM, edge isolation, UFH coordination
- 3
Pump day — single-visit pour, level and spike-roll
- 4
Cover and cure for 24-48 hours
- 5
Moisture-test sign-off, floor coverings
What backs our Crediton work
- 01Cemfloor-certified, fully insured, CDM-aware
- 02Coordinated with most South West UFH installers
- 03Pre-start meeting standard on every commercial job
- 04Local knowledge — we know the M5 (J31, ~10 mi) access window and A377 traffic patterns
Adjacent areas — usually same-week diary
Specifications suited to Crediton builds
Cemfloor CT-C30-F6
Cement-based liquid screed — robust, low-shrinkage, fast-drying.
Cemfloor Therm
Thermally-optimised for UFH.
PIR insulation + DPM
Build-up tuned to your build regs U-value.
Crediton screed questions, answered
Can you screed over an existing concrete slab?+
Usually yes — from 30mm bonded if the slab is sound. We'll inspect the substrate at the Crediton site visit.
Do you handle UFH coordination?+
Yes — we work with whichever UFH installer is on your Crediton project and align dates with their pressure-test schedule.
Can you give a fixed-price quote?+
Yes — every Crediton quote is a written fixed price against a defined scope. No day-rate surprises.
How long does the floor take to dry in Crediton?+
Roughly one day per millimetre of depth, ambient conditions allowing. We'll give you specific guidance for your Crediton pour.
Do you cover Crediton?+
Yes — Crediton sits inside our regular 30-mile working radius and we have active diary there most months.
Do you offer a guarantee?+
As a Cemfloor-certified installer, qualifying installs are backed by a 10-year manufacturer-supported guarantee.
Talk to a Crediton-area screeder
Diary fills 2-4 weeks ahead — pin a date and we'll confirm logistics.
