Liquid Screed · Somerset

Burrowbridge Liquid Screed Specialists

Burrowbridge builders pick liquid screed because it pours fast, dries faster and leaves a floor that tile and engineered timber actually want to bond to.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Burrowbridge Liquid Screed Specialists

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Burrowbridge builders pick liquid screed because it pours fast, dries faster and leaves a floor that tile and engineered timber actually want to bond to.

Unlike a traditional sand-and-cement screed, you'll be back on the floor in 24-48 hours rather than a week, and the surface is flat enough to lay LVT or large-format tile without further latex.

Most of our Burrowbridge jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Burrowbridge sits Bridgwater (7 mi), and we work the surrounding villages on the same week's diary.

Burrowbridge projects we see most

  • Levels farmhouses — a regular brief in Burrowbridge
  • Raised new-builds — a regular brief in Burrowbridge
  • Converted longhouses — a regular brief in Burrowbridge
  • Packhouse retrofits — a regular brief in Burrowbridge
  • Levels agriculture — a regular brief in Burrowbridge

Right fit for Burrowbridge rural self-builders and farms

Burrowbridge sits rural — barn conversions, self-builds, agricultural sheds, equestrian floors. Access is usually fine, but power and water on site need confirming up front. We do that at the site visit.

Liquid Screed in Burrowbridge — how it works

We pump Cemfloor calcium-sulphate screed from a static mixer into your building, level it with a dappling bar, and walk away with a floor that's typically dry enough for floor coverings in roughly one day per millimetre of depth.

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Specifications suited to Burrowbridge builds

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

How a Burrowbridge pour runs

  1. 1

    Site visit and written quote — confirm depths, area, access, build-up

  2. 2

    We prep edge insulation, polythene DPM and any UFH coordination

  3. 3

    Pump day: ready-mixed screed pumped, levelled and spike-rolled in one pour

  4. 4

    Cover and protect for 24-48 hours

  5. 5

    Light foot traffic from day 2; floor coverings once moisture content is signed off

Latest jobs across Somerset

Industrial-scale pour at Blackbrook, Taunton
Industrial-scale pour at Blackbrook, Taunton
UFH screed in a kitchen-diner extension, Taunton
UFH screed in a kitchen-diner extension, Taunton
Large open-plan pour for a new-build near Cullompton
Large open-plan pour for a new-build near Cullompton

What backs our Burrowbridge work

Hundreds of square metres poured around Burrowbridge in the last 12 months

Single-team continuity — same crew, same standards, every job

Written fixed-price quotes — no day-rate creep

Moisture-test handover record so flooring contractors take the slab on without dispute

Burrowbridge screed questions, answered

Can other trades work above while you pour?+

We prefer the floor area cleared on pour day, but trades can work in unrelated areas. We'll set out a sensible plan with your site manager.

How quickly can I walk on a liquid screed floor in Burrowbridge?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Burrowbridge job.

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Burrowbridge site visit.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Burrowbridge pour in the colder months.

Does liquid screed crack like sand-and-cement?+

Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.

Do I need to be on site for the pour in Burrowbridge?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Burrowbridge access route, pump position and waste route before the day.

Ready for a laser-flat floor in Burrowbridge?

Send us the floor area, build-up and target dates — we'll come back with a fixed quote and a date.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp