Liquid screed pour near Liquid Screed — Braunton, Devon

Liquid Screed · Devon

Liquid Screed — Braunton, Devon

Across Braunton we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Same-day quotes Fixed pricing Fully insured crews 5★ Google & Yell reviews 07791 510849
Free quote · No obligation

Get a fixed price for Braunton, Devon

30 seconds. We'll come back same-day with a fixed price and next available date.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed

Across Braunton we lay self-levelling Cemfloor screed at depths from 30mm, pumping straight off the truck and finishing to a true SR1 — no hand-trowelling, no cold joints.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Most of our Braunton jobs sit within 30 minutes of base, so site visits stay simple and pour days run to time. Braunton sits Barnstaple (5 mi), and we work the surrounding villages on the same week's diary.

EX33 access, routes and logistics

County

Devon

District

North Devon

Postcode

EX33

Nearest city

Barnstaple (5 mi)

Nearest motorway

M5 (J27, ~45 mi)

Primary A-road

A361

Local industries

tourism lets, harbour trades

Common builds

seafront apartments, 1930s coastal semis

What Braunton builds usually need

  • Seafront apartments — a regular brief in Braunton
  • 1930s coastal semis — a regular brief in Braunton
  • Harbourside conversions — a regular brief in Braunton
  • Guest-house retrofits — a regular brief in Braunton
  • Tourism lets — a regular brief in Braunton

Liquid Screed in Braunton — how it works

The screed arrives ready-mixed on a truck, gets pumped through a hose to wherever it's needed in the building, and self-levels to within a couple of millimetres across the room. We spike-roll it to release air, then leave it.

Liquid screed bonds into a single monolithic layer with no bays, no day joints and no need for steel mesh — it's poured around any UFH pipework you've already pressure-tested.

Specifications suited to Braunton builds

Cemfloor CT-C30-F6

Cement-based liquid screed — fast-drying, low shrinkage, suitable for most floor coverings.

Cemfloor Therm

Optimised for underfloor heating with high thermal conductivity.

Acoustic and thermal insulation underlay

PIR, EPS or acoustic mat depending on the build-up.

Edge isolation strip

10mm closed-cell foam to allow thermal movement.

Recent work near Braunton

Open-plan ground floor poured for a new-build in Exeter
Open-plan ground floor poured for a new-build in Exeter
Estuary-side residential retrofit in Topsham
Estuary-side residential retrofit in Topsham
Fresh liquid screed pour in an Exeter extension
Fresh liquid screed pour in an Exeter extension

Trust points for a Braunton brief

Cemfloor-certified installer — qualifying jobs covered by a 10-year manufacturer-supported guarantee
Fully insured, RAMS and method statements supplied for every commercial pour
Active diary across Devon — fresh Braunton-area work most months
SR1 flatness as standard — within 2mm under a 2m straight-edge

FAQs from Braunton clients

Can liquid screed go over an existing concrete slab?+

Yes — typically unbonded over a DPM and slip membrane, from 35mm. We'll assess the substrate at the Braunton site visit.

How quickly can I walk on a liquid screed floor in Braunton?+

Light foot traffic from 24-48 hours after the pour. Heavy loading, follow-on trades and final floor coverings depend on depth and ambient conditions — we leave you with clear drying guidance for your specific Braunton job.

Can you pour in cold weather?+

Yes, with the right ambient control. We won't pour below 5°C and we'll discuss frost protection for any Braunton pour in the colder months.

Do I need to be on site for the pour in Braunton?+

Not necessarily — we usually agree access with the main contractor or self-builder and run the pour with our own team. We'll confirm the Braunton access route, pump position and waste route before the day.

Do you offer a guarantee?+

Yes — as a Cemfloor-certified installer, qualifying jobs are backed by a 10-year manufacturer-supported guarantee.

Does liquid screed crack like sand-and-cement?+

Calcium-sulphate and modern cement-based liquid screeds have very low drying shrinkage. With proper edge isolation and joints at doorways, cracking is rare.

If you're planning Liquid Screed in Braunton, the brief almost always comes down to flatness, dry-time and access — get those right and the trades behind you stay on programme.

Need Liquid Screed priced for Braunton?

Tell us the square metres and access notes. Most Braunton quotes go out the same day.

Free quote · No obligation

Ready to get a price?

Tell us the rough size and location — we'll come back with a fixed quote today.

Call mobile

Or call our landline on 01392 237700

Same-day reply
Fully insured
5★ reviewed
Mobile Landline WhatsApp